Division 02

We build the whole thing,
villa to district

Seventeen build categories under one contract. Homes, hotels, hospitals, camps and smart-city infrastructure, engineered in our factories and finished on your site.

TurnkeyOne contract
In-houseDesign & engineering
FactoryControlled quality
WorldwideDelivery & install
The index

Seventeen categories, five families

Every category has its own page with layouts, specifications, finishes and delivered examples. Start with the family that matches your project.

What you get

One team from drawing to keys

A

Turnkey delivery

Design, engineering, production, shipping, installation and commissioning sit in one contract with one project manager.

B

Engineering & compliance

Structural, seismic, wind and thermal calculations prepared for your jurisdiction, with drawings ready for permit submission.

C

Factory-controlled quality

Building indoors removes weather from the programme. Every module is inspected and signed off before it leaves the line.

D

Smart systems built in

Automation, security, metering and solar are specified during design, not retrofitted after handover.

How a project runs

Six stages, fixed dates

You get a programme at contract signing and a named manager who holds it.

  1. Brief

    Site, use, budget and timeline. We tell you what is feasible before anyone pays for drawings.

  2. Design

    Layouts, elevations and finish selection, revised with you until the plan is signed.

  3. Engineering

    Structural and services design, plus the documents your local authority needs for permits.

  4. Production

    Modules built and inspected in the factory while site works and foundations run in parallel.

  5. Install

    Shipping, craning, connection and fit-out completion by our own installation crews.

  6. Handover

    Commissioning, snagging, manuals, training on the smart systems, and warranty support.

Start here

Tell us about the project

Send the brief and you will hear back within two working days with next steps and an indicative range.

Axion company profile

Who we are, how the divisions work together, and what we deliver, with full contact details.

Download the profile (PDF)
Answers

Asked before you ask

How fast is a build, really?
Factory production runs at the same time as your foundations and site services, which is where the time is saved. A capsule or container unit is quick; a villa takes considerably longer. We issue a dated programme with the fixed specification, and that is the one we work to.
Do you handle permits and foundations?
We produce the structural, thermal and services documentation your authority requires, and we work with your local engineer on submission. Foundations, connections and site preparation can be included in the contract or left with your contractor, your choice at quotation stage.
Can layouts and finishes be changed?
Yes. Every category page shows standard layouts as a starting point. Room configuration, cladding, glazing, kitchens and bathrooms are all specified with you during the design stage, and anything outside the index goes to Custom Projects.
Where do you deliver?
Units ship as standard container loads or flat packs, so delivery reaches most coastal and inland markets. Tell us the country and site access in the inquiry form and we will confirm shipping, duties and installation crew arrangements.
What is included in the smart-home package?
Lighting, climate, access control, cameras, energy metering and solar readiness, run from a single app. It is wired during production, commissioned at handover, and we train you on it before we leave.

Contact Us